GBase News
GBase 8s Shenzhen Metro: 10M Rides Data Backbone
From November 18 to 19, 2026, the 33rd APEC Economic Leaders' Meeting was held in Shenzhen. As host city of APEC China 2026, Shenzhen once again stood on the world stage. Under the theme "Building an Asia-Pacific Community to Prosper Together," openness, innovation, and cooperation run through the year's agenda as three priority areas.
Openness is most tangibly reflected in the movement of people — and crowds converging on a city ultimately flow onto its metro lines. Shenzhen's urban rail network spans 17 operating lines totaling 634.5 kilometers with 441 stations, serving more than 10 million passenger trips a day. Behind this flow, GBase databases have been running steadily for four years in core systems for automatic fare collection, clearing, and multi-line centers.
Beneath the Spotlight, the City's Daily Operations
During APEC, the parts of Shenzhen that were "seen" were the visible ones: the Qianhai venue, the vessels at Yantian Port, the production lines in Nanshan. But what keeps an international conference running smoothly is often what goes unnoticed. When a delegate arriving from overseas lands at the airport and transfers to the metro into the city, the card swipe, the gate, and the exit take only tens of seconds.
In those tens of seconds, a card or QR code completes a transaction at the station, the data is uploaded to the line center, and the clearing system settles revenue across lines and operators. At the scale of tens of millions of trips, these are real transactions every day — and any hesitation is felt immediately by passengers.
The "intelligence" of rail transit must first be built on "not failing" — and in technical terms, that means database stability over long cycles, under high concurrency, and with massive data volumes.
A Choice Made in 2022
Shenzhen Metro's work with GBase dates back to 2022.
During construction of the Phase IV project in 2022, GBase became deeply integrated into the metro's digital roadmap. Phase IV adopted a full-stack technology roadmap, with key systems — the Automatic Fare Collection system (AFC), the rail transit clearing system (ACC), the multi-line central computer system (CLC), and the Internet Ticketing Platform — all built on GBase 8s as their underlying engine.
This supported real-time transaction processing and business management at tens of millions of passenger trips, delivered an independent technology stack from back end to front end, and broadened the options available to users and integrators seeking greater flexibility in technology selection.
Stability, Proven by Operational Data
Ultimately, whether a database fits rail transit comes down to its performance under real passenger flows. As Phase IV lines entered service and subsequent lines continued to connect, the results of the GBase deployment were systematically validated:
Scalable, stable capacity
Several hundred nodes have been deployed in total, covering ACC/CLC centers and AFC station nodes, enabling unified access to Phase IV and future Phase V AFC systems and smooth onboarding of earlier systems.
Reliable operation under high concurrency
With daily passenger volumes above 10 million, the ACC system processes tens of millions of transactions per hour; the CLC system runs steadily under 3,600 concurrent connections, with overall resource utilization consistently held at a healthy 40%.
Efficient management of massive data
The largest single table has passed 1.2 billion rows, fully supporting real-time processing needs such as passenger flow analysis and revenue clearing.
The Value of Modernization: More Than a Technology Change
Cost is an unavoidable factor. According to project estimates, with the GBase 8s-based full-stack solution, Shenzhen Metro's database investment fell by roughly 60% compared with the original plan, and ongoing operations costs were optimized accordingly.
A more significant change is the opening up of choice. In the past, options for core-system databases were limited, and users and integrators faced a fairly fixed technology path. With an option validated at large scale, solution design can stay closer to the business itself.
This is also the practical meaning of "cooperation," a priority area of this APEC meeting: a database that runs reliably in core rail systems is not the delivery of a single vendor, but the long-term collaboration of users, integrators, and product teams across requirements definition, adaptation and tuning, and operations support. To date, GBase databases have been deployed in core business systems across aviation, railways, and more than 70 metro lines nationwide.
Next Stop: From Supporting Systems to Supporting Decisions
Under APEC's "innovation" priority, AI and data are recurring themes. In July this year, the APEC Digital and AI Ministers' Meeting adopted the Chengdu Statement, which for the first time elevated "open source" to ministerial-level cooperation. The APEC High-Level Roundtable on Data for Growth, held alongside the ministers' meeting, made data a standalone topic for the first time, advancing cooperation from "managing data well" to "using data well."
For the metro, this shift already has concrete implications: passenger flow forecasting, service planning, ticketing product design, and equipment condition monitoring and maintenance all rest on high-quality, traceable, real-time data. The database's role is expanding from "recording every transaction" to "supporting every decision."
As networks grow denser and passenger volumes climb, the demand on underlying systems is no longer "good enough" — it is whether they can stay stable, scalable, and manageable over the long term, which is exactly what the Shenzhen Metro project has repeatedly validated.
APEC lasts only a few days; a city runs every day. From the Phase IV launch in 2022 to the simultaneous opening of four lines (sections) at the end of 2025, the partnership moved from "pilot" to "core business." Openness makes a city busier, innovation makes systems smarter, and cooperation lets every link in the value chain participate. Building the foundation on technology the team can master — and letting it run quietly and reliably for the long haul — may be the unassuming part of the "Shenzhen experience."
FAQ
Which GBase products and systems are used in Shenzhen Metro?
Phase IV adopted a full-stack technology roadmap, with key systems — Automatic Fare Collection (AFC), rail transit clearing (ACC), the multi-line central computer system (CLC), and the Internet Ticketing Platform — all built on GBase 8s as their underlying engine.
When did the partnership begin, and how large is the deployment?
It dates back to 2022 and the construction of Phase IV. Several hundred nodes have been deployed across ACC/CLC centers and AFC station nodes, enabling unified access to Phase IV and future Phase V AFC systems and smooth onboarding of earlier systems.
How does it perform in operation?
With more than 10 million daily passenger trips, the ACC system processes tens of millions of transactions per hour, and the CLC system runs steadily under 3,600 concurrent connections with resource utilization held at 40%. The largest single table has passed 1.2 billion rows, supporting passenger flow analysis and revenue clearing.
How much was cost reduced, and what else changed?
Based on project estimates, database investment fell by roughly 60% versus the original plan, with ongoing operations costs optimized as well. Beyond cost, the range of options opened up: with an option validated at large scale, solution design can stay closer to the business itself.
How widely is GBase used in rail transit?
GBase databases now run in core business systems across aviation, railways, and more than 70 metro lines nationwide. Reliability in core rail systems comes from long-term collaboration among users, integrators, and product teams in requirements definition, adaptation and tuning, and operations support.