Customer Background and Challenges
As part of its database replacement initiative and to meet financial regulators' compliance requirements for "One Form" (standardized regulatory data reporting), Zhejiang Tailong Commercial Bank Co., Ltd. launched a regulatory "One Form" database replacement project, procuring replacement database software to replace its trusted zone database and complete a smooth migration.
One Form data is centrally stored in the bank's trusted zone for standardized regulatory collection and reporting. Data volumes continue to grow, reporting timeliness is rigidly mandated, and data accuracy requirements are extremely high — while the existing foundational software carries potential risks such as foreign product license expiration and supply chain disruption. The project needed to complete the database replacement and smooth migration of the trusted zone database.
Implementation
- Cluster architecture: Deployed a 3-node GBase 8a MPP Cluster — a shared-nothing, massively parallel processing database cluster designed for large-scale data analytics. Cluster planning, design, installation, deployment, and tuning were completed based on the bank's actual One Form trusted zone business workload.
- High availability design: Data is distributed across multiple replicas, so failure of any single data node does not affect business continuity. Management nodes are deployed in primary-standby mode, eliminating single points of failure and ensuring uninterrupted regulatory data reporting.
- Three-phase migration process: Executed in three phases — "migration testing — migration rehearsal — migration go-live." Migration links and data validation rules were first verified in a test environment, followed by a full-process rehearsal with quantified cutover window timing, and finally cutover within the established window — ensuring data integrity and consistency throughout.
Results
- Compliance: Meets the bank's One Form database replacement requirements, eliminating potential risks such as foreign product license expiration and supply chain disruption.
- Business: The 10–20 TB of existing regulatory data migrated smoothly through the three-phase process. After go-live, multiple rounds of data comparison and business validation confirmed that data completeness and reporting accuracy meet requirements.
- Performance: Columnar storage and high-compression algorithms reduce storage footprint at equivalent data scale. Cluster parallel computing shortens the regulatory data processing window and improves response times for complex join queries. The cluster supports online scaling, readily accommodating continued growth in regulatory data volumes.
Case Study Q&A
Q1: What are regulatory "One Form" and the "trusted zone"?
A: One Form is a standardized regulatory data reporting mechanism under which banks report business and management data to regulators according to unified data standards. The trusted zone is a secure area within the bank where One Form standard data is centrally stored for regulatory collection. The database must simultaneously satisfy four requirements: capacity, accuracy, timeliness, and security.
Q2: Why is MPP architecture well suited to One Form databases?
A: Regulatory reporting primarily involves batch processing of massive datasets and multi-dimensional join queries. A shared-nothing MPP cluster shortens processing windows through multi-node parallel computing, while multi-replica mechanisms ensure reporting continuity.
Q3: How is consistency guaranteed when migrating 10–20 TB of existing data?
A: A three-phase approach is used: "test — rehearse — go-live." The test environment first validates migration links and validation rules; the rehearsal phase runs the full process and quantifies the cutover window; after formal cutover, multiple rounds of data comparison confirm completeness.
Q4: Will a data node failure affect regulatory reporting?
A: No. Data is distributed across multiple replicas, so failure of any single data node does not affect business continuity. Management nodes are deployed in primary-standby mode, with no single point of failure.