Customer Cases

Focus on Database Software Products and Services, Committed to becoming the most trusted provider of database products for users.

China Reinsurance (Group) Corporation Climate Change Physical Risk (Flood) Stress Testing Project

Two GBase 8s clusters for China Reinsurance (Group) Corporation stress testing

Customer Background and Challenges

China Reinsurance (Group) Corporation is building a climate change physical risk (flood) stress testing project, requiring climate risk data modeling and stress simulation for flood scenarios within its own environment. This type of workload imposes requirements on the data foundation that differ significantly from conventional transaction systems: multi-source heterogeneous data from meteorology, geography, and insured subjects must be hosted in a unified manner; repeated adjustment of scenario parameters means compute tasks must be re-run repeatedly; test results feed directly into risk measurement and decision-making, leaving no room for data errors; and testing cycles are tied to business reporting deadlines, making downtime unacceptable.

The project also required the underlying foundational software to be replaced. To this end, China Re Group procured two GBase 8s V8.8 transaction-processing databases from GBASE as the foundational data platform for its flood risk stress testing business.
 

Implementation

  • Cluster architecture: Built a data cluster on two GBase 8s databases to host the massive data storage, computation, and query workloads associated with flood stress testing, supporting two core workload types: climate risk modeling and stress simulation.
  • Data distribution: Supports HASH and RANDOM distribution strategies, with flexible, customizable sharding based on business needs. This adapts to multi-source test data from meteorology and geography, avoiding long-tail queries caused by data skew on any single node.
  • High availability: Supports 1–2 customizable replicas, with automatic fault detection and self-healing for replica failures. Replica failures do not affect business operations, requiring no manual intervention.
  • Disaster recovery: Supports primary-standby high availability with full/incremental synchronization, synchronous rollback, and error recovery capabilities, and supports same-city disaster recovery deployment — safeguarding test data security and business continuity.
     

Results

  • Database-layer replacement achieved, paired with the new software and hardware environment to meet business processing and data security requirements.
  • On-demand sharding adapts to multi-source test data, delivering more balanced cluster resource utilization and supporting rapid model iteration.
  • Replica self-healing and primary-standby disaster recovery mechanisms reduce operational intervention frequency, ensuring continuous execution of flood stress testing workloads.
     

Case Study Q&A

Q1: Why does flood risk stress testing require a dedicated database cluster?

A: Data for this type of workload comes from multiple sources — meteorology, geography, and insured subjects — at large scale and in varied structures, while simulation tasks must be re-run repeatedly. A single-machine database struggles to balance storage capacity and parallel computing; clustered deployment is the only way to satisfy capacity, concurrency, and availability requirements simultaneously.

Q2: How is skew in multi-source test data handled?

A: GBase 8s transaction-processing databases offer HASH and RANDOM distribution strategies. Sharding can be selected based on data characteristics, and custom distribution keys ensure data lands evenly across nodes, preventing hot-spot nodes from slowing down overall queries.

Q3: Does a replica failure require manual intervention?

A: No. The cluster automatically detects replica failures and completes self-healing. Business operations are unaffected during the failure, reducing operational on-call pressure.

Q4: How is disaster recovery handled for test data?

A: Through a primary-standby high-availability architecture with full/incremental synchronization, plus same-city disaster recovery deployment. The synchronization process includes rollback and error recovery capabilities, allowing a return to a consistent state in the event of an anomaly.