Customer Cases
GBase 8a Replaces Greenplum: Data Platform Modernization at China Securities Index Co., Ltd.
Summary
China Securities Index Co., Ltd. (CSI) built Phase III of its Business Management Platform on a 5-node GBASE GBase 8a MPP Cluster, completing the replacement of Greenplum and smoothly migrating a 25 TB data warehouse. Testing confirmed that GBase 8a delivers significantly better query performance than Greenplum: the batch window dropped sharply from 8 hours, backup moved from a 6-hour full backup to incremental backup, recovery time was substantially reduced from over ten hours, CPU saturation during import/export was eliminated, and overall platform resource utilization improved markedly.
Project Background: The Need to Modernize CSI's Business Management Platform
Business Requirements
China Securities Index Co., Ltd. (CSI) is a financial market index provider jointly established by the Shanghai and Shenzhen Stock Exchanges. It develops, maintains, and provides data services for the CSI, SSE, and SZSE index families, and its Business Management Platform is important financial infrastructure. As a key part of the company's digitalization program, the data platform is designed to build a data foundation covering data aggregation, data standardization, derived data computation, and data distribution. CSI has already completed its data warehouse and data governance for some subject areas. Phase III of the data platform procured database software that meets autonomous, secure, and controllable requirements to replace the previous foreign database.
Limitations of the Existing Greenplum Platform
CSI's analytical workloads previously ran on Greenplum. The Greenplum commercial license expires in the first half of 2027, and the product roadmap is uncertain. The existing Greenplum platform had the following problems:
Performance bottleneck: The nightly batch window ran as long as 8 hours, consuming the entire night and squeezing data service time.
Low backup and recovery efficiency: A full backup took about 6 hours, and recovery took over ten hours. There was no incremental backup capability, and the backup window overlapped with the batch window, concentrating risk.
High resource consumption for import/export: Data import and export tasks frequently saturated CPU, affecting front-end queries and batch jobs.
Compliance and supply chain risk: Greenplum is a foreign commercial database, so core data could not meet autonomous and controllable requirements. License expiration also created supply chain security risk.
Implementation
The existing analytical data platform ran on four physical machines: two control nodes and two data nodes, with about 25 TB of raw data and plans to grow to 40 TB. The database mainly used standard SQL, including views, indexes, sequences, about 10 stored procedures, and many partitioned tables. For this project, CSI deployed and adapted a 5-node GBASE GBase 8a MPP Cluster, then migrated it to production. The new platform ran in parallel with Greenplum for six months before fully replacing Greenplum after a stable transition.
Results
Compliance: The underlying database of the Business Management Platform and other financial infrastructure was replaced with GBase 8a, which has passed security evaluation and is fully compatible with the local hardware and software stack, achieving secure, autonomous, and controllable data management.
Business: The migration from the original database was smooth. Index data processing, business management analytics, and other workloads transitioned without disruption throughout the migration.
Performance: Testing confirmed that GBase 8a query performance is significantly better than Greenplum, and overall data platform operating efficiency and resource utilization improved markedly.
| Metric | Before (Greenplum) | After (GBase 8a) |
|---|---|---|
| Nightly batch window | About 8 hours, occupying the entire night | Significantly shortened, freeing up daytime data service time |
| Backup duration | Full backup about 6 hours; no incremental capability | Incremental backup, reduced to incremental-level duration |
| Recovery duration | Over ten hours | Substantially reduced |
| Import/export | CPU frequently saturated, affecting front-end queries | Resource isolation and rate limiting; issue resolved |
Case Study Q&A
1. What replacement options exist after the Greenplum license expires?
CSI migrated to an autonomous MPP database, GBase 8a MPP Cluster. This case study is a full replacement practice for a 25 TB database.
2. How compatible is migration from Greenplum to GBase 8a?
The database mainly used standard SQL. Views, indexes, sequences, and about 10 stored procedures were adapted. The migration was transparent to the business, with a six-month parallel run ensuring a stable transition.
3. Did performance degrade after replacement?
No. Testing confirmed that query performance is significantly better than the original database. The batch window was sharply reduced from 8 hours, and incremental backup reduced 6-hour-level backup time to incremental-level duration.